Evaporative systems

Condair ME evaporative humidifier and cooler

Condair ME

Evaporative humidifier and cooler
The Condair ME provides low energy humidification and evaporative cooling to an air handling unit or duct. A single unit can provide up to 1,080kg/hr of humidification and 740kW of evaporative cooling to an air stream while operating on less than 1kW of electricity. This system is designed with advanced hygiene technologies, including aerosol-free humidity control and optional UV water treatment.
read more
Condair MC in-duct evaporative humidifier

Condair MC

Evaporative humidifier and cooler
The Condair MC consists of an evaporative module and hydraulic unit, which is located inside the air handling unit (AHU), and a control panel mounted outside the AHU. It can provide low energy humidification and cooling with a single unit offering up to 360kg/h of humidity and approximately 245kW/h of adiabatic cooling. The evaporative humidifier incorporates long-lasting glass fibre media and stainless-steel construction. Water is supplied to the evaporative module in up to three stages, depending on humidity demand, allowing for accurate humidity control.
read more

Condair PH

On-site evaporative humidifier
As an evaporative humidifier, the Condair PH is widely used in various datacentres. It delivers adiabatic humidification and cooling directly to a room and is characterised by low energy consumption and high cost-effectiveness. For every 1kg/h of water evaporated from the media, approximately 0.68 kW of evaporative cooling is also delivered to the airstream. For many applications, both humidification and cooling is required, which makes using an evaporative humidifier a good choice as it uses significantly less energy than traditional mechanical cooling.
read more

Custom evaporative systems

Evaporative systems
Looking for a custom evaporative system designed precisely for your unique application? Condair’s expertise in developing tailored solutions means you get a system that maximizes efficiency, fits seamlessly within your space, and meets your specific performance goals. Whether it’s for industrial, data center, commercial or other specialized environments.
read more

Get free expert advice

If you want to explore your options for humidity control, Condair's expert sales engineers will visit your site, review your project and talk you through their recommendations.

Alternatively, if you would prefer a call or online meeting, our team are always happy to discuss possible solutions and offer free technical advice.

Kuul views and insights

Condair's experienced engineers and other partners have teamed up to create the Condair Knowledge Center. It provides actionable insights customers can use to make informed decisions and enhance cooling operations.

Get in touch with us

Consultant

Copytext

Condair Experts

Copytext